Planning
Thompson has been operating on the Fort Hills Site since 2014 to current. Thompson’s experience background and industry leading professional performances has allowed for the organization to execute over 310 projects on the Fort Hills site. Thompson’s versatile abilities has executed a wide range of projects ranging from large Infrastructure Projects, Multi Million Cubic meter projects within Reclamation Material Salvage Programs along with Assisting Mine Advancements in hauling Overburden, Development & Maintaining of Various Mining Haul Roads, Installation of Large Dyke Drainage Systems, numerous Storm Water Retention Ponds and Construction Water Management Drainage Ditching Projects. Thompson construction readiness, quality of workmanship and endless efforts to maintain scheduled deadlines is driven by the first-class safety culture which has contributed to Thompson’s highest levels of achievements on site to date.
Scope of work
Client:
Suncor
Project Location:
Fort Hills, AB
Major Quantities:
- Infrastructure HDPE Installation – 4km
- Reclamation Material Salvage – Over 12,000,000 m3
- Mine Advancement Overburden Excavation – Over 6,000,000 m3
- Site Interior / Exterior Roadway Development – 25km
- Mining Haul Road Development & Maintenance – 18km
- Dyke Drainage Systems HDPE – 8km
- Storm Water Retention Ponds / Outlet Structures – In Excess of 15 Ponds/Structures
- Construction Water Management Ditching – 15km
- General Common Excavation – Over 8,000,000 m3
Work Commenced:
February 2014
Work Completed:
On going
Common Excavation
Construction Date
Work Completed