Select a category below to filter our projects by division.
108 Street Neighborhood Rehabilitation
Thompson Infrastructure was selected by the City of Fort Saskatchewan as the General Contractor.
Jasper Avenue New Vision
Required the upgrading of a main waterline feed and industrial services connected to Canada Place in 97 Street.
Highway No. 29, Lynx Creek
Construction of 7.8km of highway 29 to two lanes, including construction of a 152m, three-span steel girder bridge.
Town of Wainwright
As the General and Prime Contractor, TIL coordinated the completion of surface works restoration and mechanical requirements.
EPCOR Flood Mitigation Ponds
Thompson Infrastructure was contracted to install underground utilities.
Canadian Rockies
Constructing a processing facility for a new a new product presented opportunities to streamline overall design and construction.
Veterinary Clinic
Working closely with an architectural and engineering team created an opportunity to build a space that would meet our clients needs.
Mindable
Thompson began this project by working with our client to design and create their dream open concept office space.
Kitimat
Thompson has been contracted to support the offshore LNG Canada terminal dredging works.
Suncor Base Mine
Thompson's original project on this site was to haul material across the Athabasca River Bridge for building of filters in dikes.
Fort Hills
Thompson has been operating on the Fort Hills Site since 2014 to date.
Kearl – MPAR
This project consisted of the re-routing of the Main Plant Access Road (MPAR). A 12 km Road Project with 7 water course crossings including a bridge.
Glenridding Stage 5
Glenridding is a residential subdivision in Edmonton, we installed a new water and sewer mains and main road construction.
Griesbach 19
This project consisted of installing new services and maintaining essential services to existing homes during our construction.
Stillwater 1
Stillwater was the first stage of a residential subdivision in Edmonton, we installed new water and sewer mains and pre-graded the road for paving.
Carmon Creek
This project consisted of site excavation, preparation, and culvert installation north-east of Peace River.
East Athabasca
This project consisted of construction of the East Athabasca Highway including several bridges and bridge culverts.