Planning
Thompson Infrastructure Ltd. (TIL) was awarded the Town of Wainwright Sanitary Lift Station and Gravity Trunk Main project in spring 2020. The scope included excavation and installation of an 11m deep lift station with corresponding gravity and forced sewer mains through both greenfield and existing roads. As the General and Prime Contractor, TIL coordinated the completion of surface works restoration as well as all mechanical requirements for the lift station.
Scope of work
Client:
Town of Wainwright
Project Location:
Wainwright, Alberta
Major Quantities:
- Supply & Install a new pre-cast Sewer lift station (11M Depth) along
- Installed approx. 400LM of Gravity Sewer Trunk Line by open cut (4-7M Depth)
Work Commenced:
September 2020
Work Completed:
On going
3000+
Man hours to date
September 2020
Work started
On going
Work Completed
Contact Us
info@thompsoncg.ca
p (780) 962-1030
f (780) 962-3903
Head Office
411 South Ave, Spruce Grove
AB, Canada, T7X 3B5